For consulting engineers Lagoon Design Resources for Engineers

Technical data, design basis and design support for lagoon aeration, ammonia and nutrient removal. Send us your flows and limits and we will return a preliminary design you can put in your report.

Engineering support What we provide for your project.

From the first facility plan through startup.

Preliminary design

Process calculations for your flows and loads: treatment by cell, oxygen demand, airflow, aerator count and blower sizing.

Layout drawings

Aerator and air piping layouts for your lagoon geometry, with manifold or floating lateral distribution.

Guide specifications

Editable specification sections for aeration, ammonia removal and nutrient removal systems.

Budgetary pricing

Equipment and installation budgets for facility plans, preliminary engineering reports and funding applications.

BABA documentation

Build America, Buy America compliance documentation for federally funded projects.

O&M manuals and training

Complete operation and maintenance manuals, startup support and operator training.

Design inputs What we need to size a system.

Send what you have. We can start a preliminary design with flows, loads and lagoon dimensions, and refine it as the rest comes in.

Send your design data
FlowsAverage and peak influent flow (MGD), current and design year
LoadsInfluent BOD₅, TSS and TKN or ammonia (mg/L)
Permit limitsEffluent BOD, TSS, ammonia, total nitrogen and phosphorus, with seasonal limits
Lagoon geometryNumber of cells, dimensions, side slopes and side water depth
Site conditionsElevation, and summer and winter water temperatures
Existing equipmentAerators, blowers, air header and available power

Lagoon aeration design basis How we size an aeration system.

Every design comes with its calculations, so you can check the work.

  1. Treatment by cell

    BOD removal is modeled cell by cell with first-order kinetics for complete mix or partial mix cells, corrected for summer and winter water temperature.

  2. Oxygen demand

    Actual oxygen requirement is built from the BOD removed and, where nitrification is required, the TKN oxidized (4.6 lb O₂ per lb).

  3. Field correction

    Oxygen transfer is corrected from standard to field conditions for alpha, beta, temperature, site elevation, submergence and operating dissolved oxygen.

  4. Airflow and aerators

    Required airflow sets the aerator count, checked against each model’s airflow range and the mixing needs of the cell.

  5. Pressure and blowers

    Water depth plus aerator, tubing and piping losses set discharge pressure, which sizes blower horsepower with a design cushion.

Need a quick energy number for a report? Try the lagoon aeration energy calculator.

Technical data Ares Aeration® and NitrOx® specifications.

From the current operation and maintenance manuals. Full manuals, drawings and guide specifications are available on request.

Ares Aeration® standard models

ModelMax. widthWeightAirflow rangeTypical design airflowMin. water depth
Ares 500T60 in125 lb15–50 scfm20 scfm4.5 ft
Ares 750T (standard)80 in138 lb15–80 scfm35 scfm4.5 ft
Ares 1000T100 in151 lb15–105 scfm50 scfm4.5 ft

Standard (T) models. Extra tall (XT, 50 in) and extra short (XS, 23 in) versions fit minimum depths of 5.5 ft and 3.0 ft, and custom heights are available.

Ares Aeration® materials and operating limits

ItemSpecification
ConfigurationStatic tube with coarse-bubble diffusers, surrounded by ten fine-bubble diffusers (Ares 750T)
Fine-bubble membranesSilicone standard; polyurethane and EPDM available
BasePowder-coated cast iron (ASTM A159), self-weighted
Hub and diffuser armsGlass-filled polypropylene hub, polypropylene arms
Hardware316 stainless steel
Air tubingWeighted flexible PVC, 1.5 in inside diameter, UV stabilized
Unit height41 in; diffuser arms sit 9 in above the lagoon bottom
Water temperature2–50 °C (35.6–122 °F)
Air filtrationAt least 90% removal of particles 5 microns and larger
Influent screeningRecommended for solids larger than ¼ in

Ares Aeration® preventive maintenance

TaskMunicipalIndustrial
Check bubble pattern and system pressureDailyDaily
Membrane blow-out (about 30 minutes per group)QuarterlyMonthly
Purge the air headerQuarterlyQuarterly
Actuate ball valvesYearlyYearly
Clean aerators with high-pressure waterEvery 5 yearsEvery 5 years
Replace diffuser armsEvery 15 yearsAs needed

All tasks are done from the surface. Intervals are “or as needed”.

NitrOx® reactor technical data

ItemSpecification
ProcessMoving bed biofilm reactor (MBBR) after the lagoon
MediaNitroHive HDPE biofilm carriers, 25 mm diameter × 4–5 mm thick
Media surface area900 m²/m³ effective (submerged)
Media retentionDuckbill check valves at the influent, stainless steel sieves at the effluent
Aeration and mixingAres Aeration® fine and coarse bubble; no mechanical mixers
Temperature controlPatented process with an immersion heater in every reactor. It runs only when the water drops too cold for nitrification, holding it above 5 °C (41 °F)
Operating water temperature5–35 °C (41–95 °F)
CoversFloating insulated covers (EPS core, HDPE/LDPE wrap)
HeatersIncoloy elements, 304 stainless wetted parts, NEMA 4X junction box, Type K thermocouple
Foam controlAir-lift foam sprayers, no pumps
ControlsOne panel for blowers, heating and temperature monitoring

Heater sizing, reactor volume and media fill are designed for each site.

NitrOx® preventive maintenance

TaskMunicipalIndustrial
Check bubble pattern and system pressureDailyDaily
Membrane blow-outQuarterlyMonthly
Purge the air headerQuarterlyQuarterly
Heater maintenanceYearlyYearly
Actuate ball valvesYearlyYearly
Inspect sieves and clean debris basketAs neededAs needed
Clean aeratorsEvery 5 yearsEvery 5 years
Replace diffuser armsEvery 15 yearsAs needed

Intervals are “or as needed”.

Lagoon design FAQ Questions engineers ask.

What information do you need to size a lagoon aeration system?

Influent flow, BOD, TSS and TKN, permit limits, lagoon dimensions and depth, site elevation and water temperatures. With those, we can return a preliminary design with airflow, aerator count and blower sizing.

What water depth does Ares Aeration® need?

The standard Ares needs at least 4.5 ft of water. Extra short models work down to 3.0 ft, and extra tall models are used from 5.5 ft where the diffusers should sit higher off the bottom.

How much airflow does one Ares aerator handle?

The standard Ares 750T runs from 15 to 80 scfm, with a typical design airflow of 35 scfm. The 500T runs to 50 scfm and the 1000T to 105 scfm.

What maintenance should I plan for in an O&M budget?

Daily visual and pressure checks, a quarterly membrane blow-out and header purge, yearly valve actuation, aerator cleaning about every 5 years and diffuser arm replacement about every 15 years for municipal systems.

Does NitrOx® need heat to nitrify in winter?

Every NitrOx reactor includes insulated floating covers and an immersion heater, which is central to its patented process. The heater runs only intermittently, when the water drops too cold for nitrification, and holds the reactor above 5 °C (41 °F).

Are Triplepoint systems BABA compliant?

Yes. Ares Aeration® is assembled in Centennial, Colorado from U.S.-made components, and we provide compliance documentation for funded projects.

Design request

Request a preliminary design.

Tell us about the project and attach or describe your flows, loads, limits and lagoon dimensions. A Triplepoint applications engineer will follow up.

(800) 654-9307 info@lagoons.com 12600 E. Arapahoe Rd. #100, Centennial, CO 80112