Home / Engineers
For consulting engineers Lagoon Design Resources for Engineers
Technical data, design basis and design support for lagoon aeration, ammonia and nutrient removal. Send us your flows and limits and we will return a preliminary design you can put in your report.
Engineering support What we provide for your project.
From the first facility plan through startup.
Preliminary design
Process calculations for your flows and loads: treatment by cell, oxygen demand, airflow, aerator count and blower sizing.
Layout drawings
Aerator and air piping layouts for your lagoon geometry, with manifold or floating lateral distribution.
Guide specifications
Editable specification sections for aeration, ammonia removal and nutrient removal systems.
Budgetary pricing
Equipment and installation budgets for facility plans, preliminary engineering reports and funding applications.
BABA documentation
Build America, Buy America compliance documentation for federally funded projects.
O&M manuals and training
Complete operation and maintenance manuals, startup support and operator training.
Design inputs What we need to size a system.
Send what you have. We can start a preliminary design with flows, loads and lagoon dimensions, and refine it as the rest comes in.
Send your design data| Flows | Average and peak influent flow (MGD), current and design year |
|---|---|
| Loads | Influent BOD₅, TSS and TKN or ammonia (mg/L) |
| Permit limits | Effluent BOD, TSS, ammonia, total nitrogen and phosphorus, with seasonal limits |
| Lagoon geometry | Number of cells, dimensions, side slopes and side water depth |
| Site conditions | Elevation, and summer and winter water temperatures |
| Existing equipment | Aerators, blowers, air header and available power |
Lagoon aeration design basis How we size an aeration system.
Every design comes with its calculations, so you can check the work.
Treatment by cell
BOD removal is modeled cell by cell with first-order kinetics for complete mix or partial mix cells, corrected for summer and winter water temperature.
Oxygen demand
Actual oxygen requirement is built from the BOD removed and, where nitrification is required, the TKN oxidized (4.6 lb O₂ per lb).
Field correction
Oxygen transfer is corrected from standard to field conditions for alpha, beta, temperature, site elevation, submergence and operating dissolved oxygen.
Airflow and aerators
Required airflow sets the aerator count, checked against each model’s airflow range and the mixing needs of the cell.
Pressure and blowers
Water depth plus aerator, tubing and piping losses set discharge pressure, which sizes blower horsepower with a design cushion.
Need a quick energy number for a report? Try the lagoon aeration energy calculator.
Technical data Ares Aeration® and NitrOx® specifications.
From the current operation and maintenance manuals. Full manuals, drawings and guide specifications are available on request.
Ares Aeration® standard models
| Model | Max. width | Weight | Airflow range | Typical design airflow | Min. water depth |
|---|---|---|---|---|---|
| Ares 500T | 60 in | 125 lb | 15–50 scfm | 20 scfm | 4.5 ft |
| Ares 750T (standard) | 80 in | 138 lb | 15–80 scfm | 35 scfm | 4.5 ft |
| Ares 1000T | 100 in | 151 lb | 15–105 scfm | 50 scfm | 4.5 ft |
Standard (T) models. Extra tall (XT, 50 in) and extra short (XS, 23 in) versions fit minimum depths of 5.5 ft and 3.0 ft, and custom heights are available.
Ares Aeration® materials and operating limits
| Item | Specification |
|---|---|
| Configuration | Static tube with coarse-bubble diffusers, surrounded by ten fine-bubble diffusers (Ares 750T) |
| Fine-bubble membranes | Silicone standard; polyurethane and EPDM available |
| Base | Powder-coated cast iron (ASTM A159), self-weighted |
| Hub and diffuser arms | Glass-filled polypropylene hub, polypropylene arms |
| Hardware | 316 stainless steel |
| Air tubing | Weighted flexible PVC, 1.5 in inside diameter, UV stabilized |
| Unit height | 41 in; diffuser arms sit 9 in above the lagoon bottom |
| Water temperature | 2–50 °C (35.6–122 °F) |
| Air filtration | At least 90% removal of particles 5 microns and larger |
| Influent screening | Recommended for solids larger than ¼ in |
Ares Aeration® preventive maintenance
| Task | Municipal | Industrial |
|---|---|---|
| Check bubble pattern and system pressure | Daily | Daily |
| Membrane blow-out (about 30 minutes per group) | Quarterly | Monthly |
| Purge the air header | Quarterly | Quarterly |
| Actuate ball valves | Yearly | Yearly |
| Clean aerators with high-pressure water | Every 5 years | Every 5 years |
| Replace diffuser arms | Every 15 years | As needed |
All tasks are done from the surface. Intervals are “or as needed”.
NitrOx® reactor technical data
| Item | Specification |
|---|---|
| Process | Moving bed biofilm reactor (MBBR) after the lagoon |
| Media | NitroHive HDPE biofilm carriers, 25 mm diameter × 4–5 mm thick |
| Media surface area | 900 m²/m³ effective (submerged) |
| Media retention | Duckbill check valves at the influent, stainless steel sieves at the effluent |
| Aeration and mixing | Ares Aeration® fine and coarse bubble; no mechanical mixers |
| Temperature control | Patented process with an immersion heater in every reactor. It runs only when the water drops too cold for nitrification, holding it above 5 °C (41 °F) |
| Operating water temperature | 5–35 °C (41–95 °F) |
| Covers | Floating insulated covers (EPS core, HDPE/LDPE wrap) |
| Heaters | Incoloy elements, 304 stainless wetted parts, NEMA 4X junction box, Type K thermocouple |
| Foam control | Air-lift foam sprayers, no pumps |
| Controls | One panel for blowers, heating and temperature monitoring |
Heater sizing, reactor volume and media fill are designed for each site.
NitrOx® preventive maintenance
| Task | Municipal | Industrial |
|---|---|---|
| Check bubble pattern and system pressure | Daily | Daily |
| Membrane blow-out | Quarterly | Monthly |
| Purge the air header | Quarterly | Quarterly |
| Heater maintenance | Yearly | Yearly |
| Actuate ball valves | Yearly | Yearly |
| Inspect sieves and clean debris basket | As needed | As needed |
| Clean aerators | Every 5 years | Every 5 years |
| Replace diffuser arms | Every 15 years | As needed |
Intervals are “or as needed”.
Lagoon design FAQ Questions engineers ask.
What information do you need to size a lagoon aeration system?
Influent flow, BOD, TSS and TKN, permit limits, lagoon dimensions and depth, site elevation and water temperatures. With those, we can return a preliminary design with airflow, aerator count and blower sizing.
What water depth does Ares Aeration® need?
The standard Ares needs at least 4.5 ft of water. Extra short models work down to 3.0 ft, and extra tall models are used from 5.5 ft where the diffusers should sit higher off the bottom.
How much airflow does one Ares aerator handle?
The standard Ares 750T runs from 15 to 80 scfm, with a typical design airflow of 35 scfm. The 500T runs to 50 scfm and the 1000T to 105 scfm.
What maintenance should I plan for in an O&M budget?
Daily visual and pressure checks, a quarterly membrane blow-out and header purge, yearly valve actuation, aerator cleaning about every 5 years and diffuser arm replacement about every 15 years for municipal systems.
Does NitrOx® need heat to nitrify in winter?
Every NitrOx reactor includes insulated floating covers and an immersion heater, which is central to its patented process. The heater runs only intermittently, when the water drops too cold for nitrification, and holds the reactor above 5 °C (41 °F).
Are Triplepoint systems BABA compliant?
Yes. Ares Aeration® is assembled in Centennial, Colorado from U.S.-made components, and we provide compliance documentation for funded projects.
Design request
Request a preliminary design.
Tell us about the project and attach or describe your flows, loads, limits and lagoon dimensions. A Triplepoint applications engineer will follow up.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.