Need ammonia treatment fast? Mobile NitrOx is ready to roll
An Axius Water company (800) 654-9307
Lagoons do it better

Wastewater lagoon treatment & upgrades

Reinvent your lagoon. Don't replace it.

Tighter limits on ammonia, total nitrogen, phosphorus or TSS? Growing flows? Triplepoint adds nitrification, denitrification, and phosphorus removal to the lagoon you already own, with performance we guarantee in writing.

300+lagoon installations
10,000+aeration units in the field
225 Billiongallons treated
100 MGDcumulative rated capacity
<0.1 mg/Lavg. effluent ammonia, NitrOx® systems
Aerial view of an upgraded wastewater lagoon
30+ yrsof lagoon engineering expertise

Reinvent your lagoon

Your lagoon isn't the problem. It's the foundation.

Lagoons are the most proven, lowest maintenance way to treat wastewater. When limits tighten, our technologies build on the infrastructure you already paid for, instead of starting over with a mechanical plant.

  • Reuse your basins and keep capital costs down
  • Minimal equipment, maintained from the surface
  • Same small crew, no 24/7 on-call
  • Results backed by our “We Say It, We Do It” guarantee
Why lagoons do it better

Wastewater lagoon solutions

What's your lagoon up against?

Choose the problem. See how lagoon owners like you solved it.

“Our new permit has an ammonia limit, and our lagoon can't nitrify in winter.”

Our answer · NitrOx®

NitrOx® adds a dedicated nitrification step after your lagoon, engineered to hold low ammonia year-round, even in cold climates.

<0.1 mg/Laverage effluent ammonia across NitrOx® installations
Explore NitrOx® →
NitrOx ammonia removal system at a lagoon

Turnkey rental systems

Back in compliance in days, not construction seasons.

Mobile NitrOx® is a complete biological treatment system on a road-ready trailer, not just a tank. Its MBBR media can treat ammonia, BOD and total nitrogen, and rental aeration adds oxygen and mixing where your lagoon needs it most. We deliver, install and start it up, then train your operators.

  • A new limit with a deadline construction can't meet
  • Equipment failure or a nitrification upset
  • Cold-weather nitrification support
  • Construction bypass, pilot testing or seasonal loads
~2 weekstypical time to get treatment on site
Up to 75%of six months' rent credited toward a permanent system

Funding, procurement & energy

Easier to approve. More efficient to run.

We help owners and engineers line up the paperwork that gets lagoon projects funded and keeps them affordable to operate.

Domestic procurement

BABA, AIS & Made in USA

Ares aerators are assembled in our Colorado factory from U.S.-made components, built to support the domestic procurement rules that come with federal funding.

  • Build America, Buy America (BABA)
  • American Iron and Steel (AIS)
  • Compliance documentation for your funding agency

Project funding

Smaller project, easier funding

Upgrading the lagoon you own keeps capital costs down, which helps when applying for state revolving fund loans, grants or rate approvals.

  • Support for facility plans and bid specs
  • Rent now, buy later: up to 75% rental credit

Energy savings initiatives

Aeration that pays you back

Aeration is a lagoon's largest power cost. More efficient aeration lowers that bill, and documented savings may help qualify for utility energy-efficiency programs.

  • Existing vs. upgraded energy comparison
  • Data for incentive and rebate applications

triplepoint's Lagoons Do It Better (LDIB) process

Not off the shelf. Built around your wastewater.

First, we believe lagoons do it better. Then we diagnose the real challenge, tailor the right approach, and support you through startup and beyond. Every installation is backed by our “We Say It, We Do It” Technology Performance Guarantee.

Diagnose

Lagoon specialists

Identify core issues, gather operating data, understand discharge requirements and define your objectives together.

01 / Diagnose
Tailor

A tailored process

Evaluate alternatives, review the options with your team and refine a solution matched to the site, budget and operations.

02 / Collaborate & refine
Support

We Say It, We Do It.

Help implement the solution, start up and train your operators, and continue supporting performance in the field.

03 / Support
Your lagoon. Your requirements. Our commitment.

Who we serve

Built for the people who run lagoons.

Coopersville wastewater lagoon expansion project

Case study · Coopersville, MI · LRAS™

A new dairy brought a big new wastewater load. Coopersville expanded its existing lagoons with LRAS™, more than quadrupling flow and loading capacity, instead of building a $15–18 million mechanical plant.

“We started up taking raw dairy waste since day one, and the system handled every bit without a violation.”

Steve Luke, Chief Operator, City of Coopersville
Read the case study

We're ready to help

Tell us about your lagoon. We'll tell you what it takes.

Got a new ammonia limit or a quick question about algae? A lagoon specialist will get back to you.

(800) 654-9307 info@lagoons.com 12600 E. Arapahoe Rd. #100, Centennial, CO 80112

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.